![]() |
Enron Mail |
Mime-Version: 1.0
Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Matt Hughes X-To: Edward Attanasio, Larry Campbell X-cc: X-bcc: X-Folder: \Larry_Campbell_Nov2001_1\Notes Folders\All documents X-Origin: CAMPBELL-L X-FileName: lcampbe.nsf ---------------------- Forwarded by Matt Hughes/ET&S/Enron on 01/31/2001 09:29 AM --------------------------- Kenny_Maltby@eott.com on 01/30/2001 08:09:53 PM To: Matt.Hughes@enron.com cc: AHart@kensmall.com, derickson@kensmall.com, Edward.Attanasio@enron.com, KevinS@kensmall.com, matt.hughes@enron.com, John.Shafer@enron.com, Larry.Campell@enron.com, David.Roensch@enron.com, rich.jolly@enron.com, Bob.jacobs@eott.com Subject: Re: No. Coles Levee to Rogas Interconnect - Permit & Property Owner R equirements 1) We have the permit and drawing for boring the Kern County Water Agencies Cross Valley Canal. I will also contact Helt Engineering for the canal profile and Soils Engineering for the soil analysis. 2) Permits for Hwy 43 and Interstate 5 are state Permits through Caltrans, at this time we have not received the permits. Helt Engineering has repeatedly made calls but are having difficulty getting anyone to answer the phone. I have asked them to notify Caltrans of who is the contractor for the project. Alan if you can provide me with the name of the boring contractor I will provide that information at the same time. If I do not have an answer soon I will make a trip to Fresno and see what I can find out. Matt, Floyd Little is the contact for Caltrans, you probably remember the problems you had when you tried to contact him. 3) Gary Fuller put West Coast Environmental in charge of obtaining a permit for crossing the Kern River By-Pass channel from the Army Corp of Engineers. As we discussed last week the application for the permit had not been filed. Larry Campell with the environmental department has been asked to contact West Coast Environmental for the status of the permit application. I will provide the drawing, permit and permit requirements when we receive them. 4) I will gather copies of the conditions and requirements from the water districts and provide that to Alan. 5) We have not received the Fish and Games approval at this time. When we receive it and have final approval from our environmental and legal departments I will provide the Permit to Alan. As you know we are at the States mercy on obtaining these permits. We are shooting for the two week starting date as mention earlier. I will keep you informed. Matt.Hughes@e nron.com To: "Hart, Alan" <AHart@kensmall.com< cc: "Matt Hughes (E-mail)" 01/30/01 <matt.hughes@enron.com<, Kenny 07:24 AM Maltby/Bakersfield/Eott@Eott, "Erickson, Doug" <derickson@kensmall.com<, "Small, Kevin" <KevinS@kensmall.com<, Edward.Attanasio@enron.com Subject: Re: No. Coles Levee to Rogas Interconnect - Permit & Property Owner R equirements Once we secure all these permits and schedule work, we will provide copies to you. Kenny/Ed-- Are we still on track to start in <= 2 weeks? "Hart, Alan" <AHart@kensmall.com< on 01/26/2001 06:53:27 PM To: "Matt Hughes (E-mail)" <matt.hughes@enron.com< cc: "Kenny Maltby (E-mail)" <kenny.maltby@eott.com<, "Erickson, Doug" <derickson@kensmall.com<, "Small, Kevin" <KevinS@kensmall.com< Subject: No. Coles Levee to Rogas Interconnect - Permit & Property Owner R equirements Matt, In order for Ken Small Construction to plan and schedule the work in the most economic manner we would like the following information in hand prior to starting field construction work. 1) Copy of permit from Kern County Water Agency for the Cross Valley Canal with the drawing that was submitted for permit application. 2) Copy of permit from Kern County for the Enos Lane crossing with drawing that was submitted for permit application, also I need to get KSCI listed as contractor on permit. 3) Copy of permit from Caltrans for the I-5 crossing with drawing that was submitted for permit application, also I need to get KSCI listed as rider along with bore contractor. 4) Copy of permit from Army Corps of Engineers for the Kern River crossing with drawing that was submitted for permit application, along with any conditions required. 5) Copy of Fish & Game, Kern Water Bank Authority, Buena Vista Water Storage and West Kern Water requirements or conditions for construction of the pipelines. Your help in letting KSCI know the status of the above permits as soon as possible will also help to set up a workable schedule that we can utilize for our construction purposes. Alan R. Hart Senior Estimator Phone (661) 391-2139 Pager (661) 329-7691 Fax (661) 393-0651 email: ahart@kensmall.com
|