Subject:Supplemental Weekend Outage Report for 10-26-01 through 10-28-01
Cc:
Bcc:
Date:Fri, 26 Oct 2001 14:45:53 -0700 (PDT)


------------------------------------------------------------------------------------------------------
W E E K E N D S Y S T E M S A V A I L A B I L I T Y

F O R

October 26, 2001 5:00pm through October 29, 2001 12:00am
------------------------------------------------------------------------------------------------------

3 ALLEN CENTER POWER OUTAGE:
Time: Sat 10/27/2001 at 4:00:00 PM CT thru Sat 10/27/2001 at 8:00:00 PM CT
Sat 10/27/2001 at 2:00:00 PM PT thru Sat 10/27/2001 at 6:00:00 PM PT
Sat 10/27/2001 at 10:00:00 PM London thru Sun 10/28/2001 at 2:00:00 AM London
From 4:00 - 8:00 p.m., Trizechan Properties has scheduled a shutdown of all electrical service at 3 Allen Center. Enron Network Services will power down the 3AC network infrastructure between 3:30-4:00. There will be no 3 Allen Center network access during the electrical maintenance and the outage will continue until ENS is able to power up all of the networking devices.
All 3AC and 2AC employees will have no telephone or voicemail service during outage period. When power is restored to building, systems will be powered back up and telco services tested for dial tone and connectivity.
If you need access to 3AC anytime that Saturday, you will need to contact Trizechan Properties beforehand with your security information (Jael Olson at 713-336-2300). Anyone who attempts to enter the building on Saturday that is not on the list will be denied access.



SCHEDULED SYSTEM OUTAGES:

ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.

AZURIX: No Scheduled Outages.

EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.

EDI SERVER: SEE ORIGINAL REPORT

EES:
Impact: EES
Time: Fri 10/26/2001 at 7:00:00 PM CT thru Fri 10/26/2001 at 7:30:00 PM CT
Fri 10/26/2001 at 5:00:00 PM PT thru Fri 10/26/2001 at 5:30:00 PM PT
Sat 10/27/2001 at 1:00:00 AM London thru Sat 10/27/2001 at 1:30:00 AM London
Outage: Upgrade IOS On Chicago Router
Environments Impacted: EES
Purpose: Voice Tie Lines not working correctly.
Backout: Load a different IOS.
Contact(s): Garhett Clark 713-345-9953

Impact: EES POSTPONED
Time: Sat 10/27/2001 at 6:00:00 PM CT thru Sun 10/28/2001 at 12:00:00 AM CT
Sat 10/27/2001 at 4:00:00 PM PT thru Sat 10/27/2001 at 10:00:00 PM PT
Sun 10/28/2001 at 12:00:00 AM London thru Sun 10/28/2001 at 6:00:00 AM London
Outage: Migrate EESHOU-FS1to SAN
Environments Impacted: EES
Purpose: New Cluster server is on SAN and SAN backups
This will provide better performance, server redundancy, and backups should complete without problems.
Backout: Take new server offline,
Bring up old servers
change users profiles back to original settings.
Contact(s): Roderic H Gerlach 713-345-3077

EI: ALSO SEE ORIGINAL REPORT
Impact: EI
Time: Sat 10/27/2001 at 2:00:00 PM CT thru Sat 10/27/2001 at 8:30:00 PM CT
Sat 10/27/2001 at 12:00:00 PM PT thru Sat 10/27/2001 at 6:30:00 PM PT
Sat 10/27/2001 at 8:00:00 PM London thru Sun 10/287/2001 at 2:30:00 AM London
Outage: Moving ei-dns01 and ei-dns02 from 3AC 17th floor to 35th floor.
Environments Impacted: DNS
Purpose: We are losing the space on 17th floor in 3AC. We are moving during the building power outage so that we take the server down only once.
Backout: None, we have to move before Nov.1.
Contact(s): Malcolm Wells 713-345-3716

ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages

ENRON NORTH AMERICAN LANS:
Impact: Corp
Time: Sat 10/27/2001 at 12:00:00 AM CT thru Sat 10/27/2001 at 6:00:00 AM CT
Fri 10/26/2001 at 10:00:00 PM PT thru Sat 10/27/2001 at 4:00:00 AM PT
Sat 10/27/2001 at 6:00:00 AM London thru Sat 10/27/2001 at 12:00:00 PM London
Outage: AT@T Cable & Wireless
Environments Impacted: Houston T1 to Quebec
Purpose:
Backout:
Contact(s): Brandy Brumbaugh 800-486-9999

Impact: CORP
Time: Fri 10/26/2001 at 6:00:00 PM CT thru Fri 10/26/2001 at 6:15:00 PM CT
Fri 10/26/2001 at 4:00:00 PM PT thru Fri 10/26/2001 at 4:15:00 PM PT
Sat 10/27/2001 at 12:00:00 AM London thru Sat 10/27/2001 at 12:15:00 AM London
Outage: Nortel VPN cable run
Environments Impacted: Corp
Purpose: To change VPN routing from 3AC to ECN
Backout: pull cables.
Contact(s): Chrissy Grove 713-345-8269
Vince Fox 713-853-5337

Impact: CORP
Time: Fri 10/26/2001 at 10:30:00 PM CT thru Fri 10/26/2001 at 11:00:00 PM CT
Fri 10/26/2001 at 8:30:00 PM PT thru Fri 10/26/2001 at 9:00:00 PM PT
Sat 10/27/2001 at 4:30:00 AM London thru Sat 10/27/2001 at 5:00:00 AM London
Outage: Nortel VPN router change
Environments Impacted: Corp
Purpose: To migrate out of 3AC to avoid power outage this weekend.
Backout: Turn routing to 3AC back on.
Contact(s): Chrissy Grove 713-345-8269
Vince Fox 713-853-5337

FIELD SERVICES: No Scheduled Outages.

INTERNET: No Scheduled Outages.

MESSAGING: No Scheduled Outages.

MARKET DATA: No Scheduled Outages.

NT: No Scheduled Outages.

OS/2: No Scheduled Outages.

OTHER SYSTEMS: SEE ORIGINAL REPORT

SITARA: No Scheduled Outages.

SUN/OSS SYSTEM: No Scheduled Outages.

TELEPHONY: SEE ORIGINAL REPORT

TERMINAL SERVER: No Scheduled Outages.

UNIFY: No Scheduled Outages.

----------------------------------------------------------------------------------------------------------------------------
FOR ASSISTANCE

(713) 853-1411 Enron Resolution Center


Specific Help:
Information Risk Management (713) 853-5536
SAP/ISC (713) 345-4727
Unify On-Call (713) 284-3757 [Pager]
Sitara On-Call (713) 288-0101 [Pager]
RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager]
OSS/UA4/TARP (713) 285-3165 [Pager]
CPR (713) 284-4175 [Pager]
EDI Support (713) 327-3893 [Pager]
EES Help Desk (713)853-9797 OR (888)853-9797
TDS -Trader Decision Support On-Call (713) 327-6032 [Pager]