Enron Mail

From:david.delainey@enron.com
To:ben.jacoby@enron.com, janet.dietrich@enron.com, david.parquet@enron.com,christopher.calger@enron.com, kevin.presto@enron.com, tim.belden@enron.com, dick.westfahl@enron.com, brian.redmond@enron.com
Subject:Please forward to V.P. of New Generation or person in charge of New
Cc:
Bcc:
Date:Mon, 12 Jun 2000 05:52:00 -0700 (PDT)

Cc: jeffrey.shankman@enron.com
Mime-Version: 1.0
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit
Bcc: jeffrey.shankman@enron.com
X-From: David W Delainey
X-To: Ben Jacoby, Janet R Dietrich, David Parquet, Christopher F Calger, Kevin M Presto, Tim Belden, Dick Westfahl, Brian Redmond
X-cc: Jeffrey A Shankman
X-bcc:
X-Folder: \David_Delainey_Dec2000\Notes Folders\'sent mail
X-Origin: Delainey-D
X-FileName: ddelain.nsf

Please follow up with this person if interested.

Regards
Delainey
---------------------- Forwarded by David W Delainey/HOU/ECT on 06/12/2000
12:50 PM ---------------------------



From: Jeffrey A Shankman 06/12/2000 11:53 AM


To: David W Delainey/HOU/ECT@ECT
cc:
Subject: Please forward to V.P. of New Generation or person in charge of New
Generation Projects

Can you forward this to the appropriate person? Thanks. Jeff
---------------------- Forwarded by Jeffrey A Shankman/HOU/ECT on 06/12/2000
11:50 AM ---------------------------



From: Jennifer Fraser 06/10/2000 03:20 PM


To: Jeffrey A Shankman/HOU/ECT@ECT
cc:
Subject: Please forward to V.P. of New Generation or person in charge of New
Generation Projects

I have no idea if this is for real or who should get this email at ENE.
Do you think anyone would be interested?
JF
---------------------- Forwarded by Jennifer Fraser/HOU/ECT on 06/10/2000
03:19 PM ---------------------------


"Christopher D. Hayes" <glowjax@netcarrier.com< on 06/10/2000 03:21:08 PM
Please respond to "Christopher D. Hayes" <glowjax@netcarrier.com<
To: "contact" <glowjax@netcarrier.com<
cc: (bcc: Jennifer Fraser/HOU/ECT)
Subject: Please forward to V.P. of New Generation or person in charge of New
Generation Projects




Please forward to the person in charge of New Generation Projects.

I was referred to you by the Energy Information Agency. I was wondering if
you could help me find new generation work within your company. If you are
not in the market for additional capacity I would appreciate your comments on
how I might proceed.

We primarily install, relocate or otherwise put power in service on a turnkey
basis, virtually anywhere in the world. We also do major repairs,
mechanical and electrical, rotating equipment and even substation
equipment. We have a rather strange assortment of equipment to support our
work, special hydra lift trailers for moving large engine without
disassembly, cranes for use in trying areas, high voltage bucket trucks, a
portable repair shop that can be moved to a major site that is 100 ft X 60 ft
and is fully equipped for anything from turbine repairs, installs or we can
do a large rewind ..

For off-shore work we have a floating shop, a service vessel that has
equipment on-board to move generation or also do similar service and
repairs. An example might be a turbine or other generation installation
even on a barge power plant that is in service .. we can often dock along
side and do it all as though the barge was in a harbor.

Sometimes, in addition to supplying New Equipment, we can supply used,
refurbished or surplus assets. Several possible powerplants considered for
relocation are made available by Marcor Remediation Inc. Marcor is working
with the Jacksonville Electric Authority, Basin Electric and other major US
utilities to offer certain Surplus Generating Assets to the worlds energy
sectors. This equipment is listed in some detail on our company webpage
(http://www.marcor.com/services/sales/sales.htm.) This is a partial
listing so let me know if your company contacts are in the market for
anything in particular, we may be able to help.

These are additional properties I am working on, we handle Turnkey
installations all over the world as well as a good deal of offshore work.
Currently, we can deliver an LM 6000, up and running in less than 90 days.

BARGE MOUNTED POWER PLANT, 100+ MEGAWATT


We can provide a 100+ MW Barge Mounted Power Plant, complete, ABS Certified,
consisting of two (2) 50 MW Gas Turbine Generators.
Outputs are at ISO conditions. These units will be refurbished and ready to
operate on either Natural Gas or Fuel Oil and installed on an ABS certified
barge. Delivery can occur within approximately 120 working days (4 months)
after receipt of funds as specified below.
The two Gas Turbines will be set up to operate singularly or in parallel.
The Generator output will be 10,800 volts, 3-phase, 50 HZ. (With upgrade to
60 HZ available) The power will be transported to shore by overhead
transmission lines at Generator voltage. A control room will be provided
together with switchgear and circuit disconnects.

The customer/buyer will be responsible for providing all fuel needs including
delivery and storage of fuel. The customer will also be responsible for all
Grid connections and transformation of power.

We will provide, as part of the Barge package, an emergency generator for
lighting and Barge pumps. The Turbines can be started with electric motors
powered from the emergency generator (diesel fueled) or by pressurized air.

All of this equipment is offered subject to prior sale. The costs will be
adjusted accordingly if additional or substitute equipment is required by
customer.

The two (2) Gas Turbines can be adapted to operate on Heavy Fuel (HFO) or
Bunker "C" or #6 Fuel oil, providing proper oil treatment modules are
utilized. We will offer this equipment under separate Contract.

ESTIMATE OF COSTS:
100 + MW Power Barge can be furnished as described for approx. $300.00 USD/
kW or $ 30,000,000.00.
Any commissions, "finders fees", or other unidentified costs, shall be added
to the cost shown here. At this price, USED equipment is utilized.

To prepare a formal quotation and provide detailed equipment specifics, i.e.
model numbers, serial numbers, etc., a one-percent (1%) Cash Advance shall be
placed in an escrow account with draws for the preparation of same and
expenses incurred. An Executed "Non-Disclosure, Non-Compete, Non-Circumvent
Agreement" must be signed by the "end-user". It will take two (2) weeks,
after receipt of one-percent (1%) cash advance funds, and after ALL pertinent
information regarding the ultimate construction of the barge is received by
us from the buyer, to prepare the Formal Quotation.

After receipt of the Formal Quotation/Proposal, buyer shall have two (2)
weeks to place a five-percent (5%) refundable deposit which will allow him
thirty (30) days to perform "due diligence". At the end of this "due
diligence" period, buyer shall pay eighty-five percent (85%) of the total
purchase price. The balance due shall be paid upon customer acceptance of
the unit.

Currently, we have a "window" of opportunity open to immediately initiate
necessary engineering work. This work will be accomplished by "World Class"
Maritime Contractors; therefore, meeting the highest of Standards.

NEW 1999 MODEL POWER BARGE
We can furnish 100MW Power Barge complete with two (2) new, state- of-
the-art 1999 model, Westinghouse Turbine Gensets, 50 Hz, for approximately $
420.00/kW. Same terms as above

LM 2500 GAS TURBINE POWER PLANT
ONE (1) ONLY..
G.E. LM2500-PE (UPGRADED), NATURAL GAS, WATER INJECTION,
13.8 KV, 26,500 KVA, TURBINE GENERATOR PACKAGE AS FOLLOWS:
1. ENGINE AND POWER TURBINE SECTION HAS BEEN COMPLETELY FACTORY REBUILT TO
ZERO TIME AND WILL CARRY A ONE (1) YEAR FACTORY STANDARD G.E. WARRANTY.

2. GEAR BOX, GENERATOR SECTIONS HAVE A TOTAL OF 25,000 HOURS ON THEM AND AND
WILL BE COMPLETELY REFURBISHED TO "AS NEW" CONDITION.

3. THE PROTECTION AND CONTROL SYSTEMS WILL BE REPLACED WITH CURRENT SOLID
STATE SYSTEMS IN ACCORDANCE WITH THE REQUIREMENTS FOR A NEW INSTALLATION.
THIS INCLUDED: VIBRATION SYSTEMS, GENERATOR PROTECTION, TURBINE START
SYSTEMS, OPERATOR INTERFACE COMPONENTS AND POWER SYSTEM SYNCHRONIZATION
SYSTEMS.

4. THE ENGINE AND POWER TURBINE SECTION WILL HAVE A ONE (1) YEAR WARRANTY IN
ACCORDANCE WITH A STANDARD G.E. WARRANTY AND THE REMAINDER OF THE MODULE WILL
CARRY A ONE (1) YEAR WARRANTY BY THE SUPPLIER AND IN ACCORDANCE WITH A
STANDARD FACTORY WARRANTY FOR NEW EQUIPMENT OF THIS TYPE.

COSTS

1. COST DELIVERED TO SITE IN NORTH AMERICA $ 6,000,000.00 USD

2. COST TO ASSEMBLE THE COMPONENTS TO THE
PACKAGE AT THE SITE, INSTALL THE UNIT AT THE NEW SITE AND PUT ON-LINE,
INCLUDING CIVIL WORK FOR THE BASES, TURBINE BUILDING AND AUXILIARY
ENCLOSURES, FUEL PIPING, WATER PIPING AND RELATED WORK (ASSUMING ALL IS
LOCATED ADJACENT TO THE INSTALLATION POINT), AND SUPPLY FACTORY PERSONNEL FOR
COMMISSIONING AND UNIT START, IS ESTIMATED TO COST AN ADDITIONAL....$
4,900,000.00 USD
(SUBJECT TO SITE INSPECTION)

TOTAL PROJECT COST,
UP AND RUNNING............... $8.5 Million USD



Talk soon,

Christopher D. Hayes

GLOWJAX LLC

glowjax@netcarrier.com

Ph# 1-(215)-541-1608....OR.....1-(215)-679-6093

1340 Moyer Rd.

Red Hill Pa. 18076

CONFIDENTIALITY This e-mail and any attachments are confidential and may
also be privileged. If you are not a named recipient please notify
the sender immediately and do not disclose the contents to another
person, use it for any purpose, or store or copy the information in any
medium




- att1.htm