![]() |
Enron Mail |
Cerrito Lastiendas - has meter flow on the 7th and the deal ended on the 6th. Can we extend the deal for the 48 mmbtu's that flowed or can I override the meter and add it to a day that flowed less than the nom? The third had 4861 and the nom was for 5000. Thanks - Julie
|