Enron Mail |
Cc: hollis.kimbrough@enron.com, mark.fisher@enron.com
Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit Bcc: hollis.kimbrough@enron.com, mark.fisher@enron.com X-From: Mark V Walker X-To: Kurt Anderson, Danielle Lewis X-cc: Hollis Kimbrough, Mark Fisher X-bcc: X-Folder: \mark fischer 7-12-02\Notes Folders\Notes inbox X-Origin: FISCHER-M X-FileName: mark fischer 7-12-02 LNotes.nsf Executive Summary The attached file, Clearskypavout0302, contains the production and availability data based on Visupro recorded data. The turbine production in March and Jan are within 0.3% of the substation value assuming a 2% line loss. February is still lower than the substation after all of the corrections used in March and January were applied. The turbines which had a meter reset in March were 17, 44, 59, and 93. The meter resets were corrected for. Also corrected were turbines 32 and 42 which had a communication loss at the beginning of March and turbines 69, 70, 71, 77, 82 - 93, 96, 100, 102, 103, 104-109, and 113-122 which had a communication loss at the end of March. A final correction was made to turbine 42 which had an improper Visupro address during the early part of March. The availability rose above 90% even though the production was disappointing due to frequent curtailments. There were no corrections for force majeure because no force majeure was indicated in the Daily Reports. The grid outage log information was added to the attached file for cross reference. If any further information is required then please call Mark Walker at 661 823-6753. An excel file is provided instead of a PDF file as per Asset Management request.
|