Enron Mail |
I already loaded the first week of March to try and capture the last of
February. But data is still missing. Mark Fisher 03/13/2002 07:52 AM To: Patricia Hunter/EWC/Enron@ENRON cc: Rabi Sahoo/EWC/Enron@ENRON, Jeff Marecic/EWC/Enron@Enron, Hollis Kimbrough/EWC/Enron@ENRON Subject: Re: Somerset Minana Patricia, This looks reasonable. Another common problem is for the file to be there and be for the correct turbine but be for the previous download. That is, the one downloading fails to download the newest copy and ends up sending the one sent last time. (The opening of the Paradox files to double check what date range or turbine ID was actually there is time consuming, isn't it.) As for the data for the end of Feb, if the data from the first download from March is uploaded, much of that gap could be filled in. Thanks for getting this done. If Mill Run could be next that would be great. Mark Patricia Hunter 03/12/2002 07:35 PM To: Mark Fisher/EWC/Enron@Enron cc: Rabi Sahoo/EWC/Enron@ENRON, Jeff Marecic/EWC/Enron@Enron, Hollis Kimbrough/EWC/Enron@ENRON Subject: Somerset Minana All Minana files for Somerset 2002 have been loaded. The minana Paradox file under 6Feb02 for Turbine 1 contains Turbine 3 data. There are no minana files with Turbine 1 data for Feb1 - 5. This was a common problem. The Paradox file is labeled as being Turbine A but it contains Turbine E data. Minana Paradox files for Feb 26, 27 and 28 are incomplete. The field only captured 50% of the desired data for Feb 26 - 28. This is the SPlus graphs that Fisher is used to: This is the list of data points per day. A perfect count is 144. Some of the drastic ones were researched. The Paradox file from the field did not contain 144 records. Let me know if I missed something.
|