Thanks for keeping me in the loop on this. I've known Briden for years and
would be happy to help out if it would be useful. DF




Jeffery Fawcett
03/13/2000 01:25 PM
To: Terry Galassini/ET&S/Enron@ENRON, Ronald Matthews/ET&S/Enron@ENRON
cc: Steven Harris/ET&S/Enron@ENRON, Kevin Hyatt/ET&S/Enron@Enron (bcc: Drew
Fossum/ET&S/Enron)

Subject: Estimates for potential new IPP Loads

Marketing needs an "order of magnitude" estimate for two IPP projects that
are being developed- one is NW Arizona, the other off the Panhandle
lateral. These estimates are for purposes of preliminary scoping of the
project(s). The Caithness Sandy Project is a little farther along in the
development process.

I know we've considered the Wikiup location before as being a possible "first
drop-off" point for the Panda lateral, but for purposes of this analysis,
let's look at the Caithness (Wikiup) as a stand alone project.

With respect to the Panhandle lateral project, do we even have enough flowing
gas supply to handle this load consistently? Can we meet the pressure
requirement?

Since we're probably looking at Timberline-type estimates I'm assuming this
isn't too long a putt for you guys. Can you give me a time frame to get back
to me with something, first on Caithness, then on Panhandle? Thanks.

Requesting party:
Gas consultant-
George Briden
Snake Hill Energy Resources
17 Cody Dr.
Glocester, Rhode Island 02857-2916
telephone: 401-934-1433

Project #1
Caithness Corp.- Caithness Sandy, LLC Project
Estimate to build a station and a lateral down to a location, approx. 40
miles south of
Kingman, 2 mil. S/W of Wikiup, AZ. (along Hwy. 93) in:
Sec. 5, T15N, R12W
Mohave Cnty., Az.
IPP load forcasted at 80 (1st phase) to 120 MMcf/d (2nd phase)
at not less than 450 psig.
Test Gas
Jan. 2002
Commercial
July 2002

Caithness is privately held. It has geothermal projects and one gas fired
project- S.Carolina

Project #2
Undisclosed Utility Customer (probably SPS or PNM)
Estimate to build a station and a lateral down to a (secret) location 2 miles
from TW's Panhandle Lateral
in Curry County, N.M.
IPP load forcasted 125 MMcf/d
Two GE Frame F(a)'s
550 psig minimum