There are two displays on the Portal: View Commercially Significant Constraints (display 1) and View Congestion Notification. Whenever there is a CSC violation on the Commercially Significant Constraints display, the Congestion Notification display will specifically list this violation. These two displays are consistent and updated hourly.
The MW loading on each CSC is calculated as
MW loading from each zone = (Sum of Resources in the same zone - Sum of Scheduled Load in the same zone)* shift factor
The sum of resources is calculated based on QSE's energy schedules and the sum of load is calculated based on the QSE's scheduled load for each zone.
However, the real-time BES uses resource scheduled based on QSE's resource plan and ERCOT short-term load forecast. Therefore what is posted on the Portal may be different from the CSC calculation from real-time balancing clearing. That's why for interval ending 1:15 the different zonal MCPEs could not be explained by just using these two displays. As you can see we still have a lot of work ahead of us, especially on the Portal postings.
Please let me know if you need anything else.
Thanks.

-----Original Message-----
From: Donohoo, Ken
Sent: Wednesday, August 01, 2001 11:15 PM
To: Gilbert-Smith, Doug
Cc: Bian, Jessica
Subject: RE: commerically significant constraints
Doug I do not have access to this screen or use this screen. Suggest contacting your client rep for more info. Jessica Bian knows these systems and can probably provide additional information. The only problem is she is VERY busy using these new systems. Thanks Ken D.
-----Original Message-----
From: Gilbert-smith, Doug
To: kdonohoo@ercot.com
Sent: 8/1/01 12:35 PM
Subject: commerically significant constraints
KEn,
Had a couple of quick questions regarding the csc screens in the portal
and was hoping you had time to walk me through them. I was looking at
the results for off peak and saw negative prices with the csc showing no
constraints. Looking at the csc grid, i show 546 MW of loading on the WN
flow for the interval 1:15. Does this represent the actual flow or the
planned flow? If it is the actual, how do we get a difference in price?
I am trying to better understand this screen and it would be a great
help if you could let me know what this value represents.
Thanks for your time. Feel free to call me if this would be easier to
explain over the phone.
Thanks again,
Doug Gilbert-Smith
Enron
**********************************************************************
This e-mail is the property of Enron Corp. and/or its relevant affiliate
and may contain confidential and privileged material for the sole use of
the intended recipient (s). Any review, use, distribution or disclosure
by others is strictly prohibited. If you are not the intended recipient
(or authorized to receive for the recipient), please contact the sender
or reply to Enron Corp. at enron.messaging.administration@enron.com and
delete all copies of the message. This e-mail (and any attachments
hereto) are not intended to be an offer (or an acceptance) and do not
create or evidence a binding and enforceable contract between Enron
Corp. (or any of its affiliates) and the intended recipient or any other
party, and may not be relied on by anyone as the basis of a contract by
estoppel or otherwise. Thank you.
**********************************************************************