![]() |
Enron Mail |
---------------------- Forwarded by Lorraine Lindberg/ET&S/Enron on 02/06/2001 03:28 PM --------------------------- James Centilli 02/06/2001 03:23 PM To: Steven Harris/ET&S/Enron@ENRON, Rod Hayslett/FGT/Enron@ENRON, Lorraine Lindberg/ET&S/Enron@ENRON, Denis Tu/FGT/Enron@ENRON, David Rosenberg/FGT/Enron@ENRON, Dave Waymire/ET&S/Enron, Tracy Geaccone/GPGFIN/Enron@ENRON, Tim Kissner/ET&S/Enron@ENRON, Patrick Brennan/ET&S/Enron@ENRON, Keith Petersen/ET&S/Enron@ENRON, Arnold L Eisenstein/ENRON_DEVELOPMENT@ENRON_DEVELOPMENT, Ben Asante/ET&S/Enron@ENRON, Terry Galassini/ET&S/Enron@ENRON, John R Keller/OTS/Enron@Enron cc: Subject: TW Expansion OH Rate Attached are the revised economics for the TW Expansion based on the revised cost per the email and splitting the transport rate between a demand and commodity rate based on a 85% load factor. The project of choice per todays meeting is the 150 expansion. Thanks, James ---------------------- Forwarded by James Centilli/ET&S/Enron on 02/06/2001 03:14 PM --------------------------- From: Arnold L Eisenstein@ENRON_DEVELOPMENT on 02/06/2001 09:50 AM To: James Centilli/ET&S/Enron@ENRON, Earl Chanley/ET&S/Enron@ENRON cc: James Saunders/FGT/Enron@ENRON, Gary Zahn/ET&S/Enron@ENRON, Jerry D Martin/ENRON_DEVELOPMENT@ENRON_DEVELOPMENT Subject: TW Expansion OH Rate Based on conversations between Earl Chanley and Jim Saunders, the Overhead rates for major projects to be applied to the TW expansion estimates are to be 2% of the capital estimate in lieu of the 11% in the current estimates or 15% in the current procedure for 2001. This in mind, the NEW estimate totals are: Option 1 Utilize GT Compressors iso rated at 38,000 hp to supplant the existing TW plants 1 thru 4. Rolls Royce RB 211 or GE LM 2500 Original Cost per unit $24.9 MM including $2.1 MM for overhead allowance New Cost per unit is $23.3 including 0.5 MM for overhead allowance TOTAL FOR 4 STATIONS IS $93.3 MM Option 2 Utilize GT Compressors iso rated at 15,000 hp to augment the existing TW hp at stations 1 thru 4 Solar Mars T100 or GE/NP PGT 10B Original Cost per unit $15.2 MM including $1.27 MM for overhead allowance New Cost per unit is $14.25 including 0.3 MM for overhead allowance EXISTING UNIT OVERHAUL COSTS FOR EXPANSION $2.0 MM PER STATION EMISSIONS RETROFIT $0.6 MM PER STATION TOTAL FOR 4 STATIONS IS $67.4 MM PLEASE CONFIRM THAT THESE NUMBERS ARE CORRECT AND SHOULD BE USED FOR THIS PROJECT and we will then change the FERC schedule k to be filed
|