Enron Mail

From:bounce-app-ippexecs-33275@ls.eei.org
To:app-ippexecs@ls.eei.org
Subject:Alliance Info Alert
Cc:
Bcc:
Date:Thu, 4 Jan 2001 05:58:00 -0800 (PST)

== SPECIAL ANNOUNCEMENTS==

On January 2, FERC filed a response in opposition to the emergency petition
SOUTHERN CALIFORNIA EDISON filed December 26 for a writ of mandamus against
FERC in the U.S. Court of Appeals for the District of Columbia. Edison has
asked the Court to direct FERC to fix by order just and reasonable cost-based
rates for the CA ISO and Cal PX markets.

On December 22, FERC issued an Order regarding remedies for the California
wholesale market that included the requirement of a technical conference on
the development of market monitoring procedures. This conference has been
scheduled for January 23, 2001 at FERC. EL00-95-000 et. al.

== RECENT FERC FILINGS ==

(1) RTO DEVELOPMENTS

* CENTRAL ILLINOIS LIGHT CO., CINERGY CORP., HOOSIER ENERGY R.E.C., SOUTHERN
ILLINOIS POWER COOP., SOUTHERN INDIANA GAS & ELECTRIC CO. and WABASH VALLEY
POWER ASSOC. filed (1) their notice for authorization to withdraw from the
MIDWEST ISO, effective on the date that ILLINOIS POWER CO., COMMONWEALTH
EDISON CO. and/or AMEREN are permitted to withdraw; and (2) a request that
the Commission authorize a Designated Transmission Owner having Commission
jurisdictional rates and charges to recover, through its Commission
jurisdictional transmission service rates and charges, the costs incurred by
the Designated Transmission Owner as a result of its withdrawal from the
MIDWEST ISO. ER01-731-000. Comments due by January 11, 2001.

* NYISO filed a status report on governance issues in compliance with Docket
Nos. ER97-1523-005, ER97-1523-006, OA97-470-006, ER97-4234-004 and
EC99-31-001. Comments due by January 10, 2001.

* After a request filed by numerous entities, an extension of time to file
comments and protests to GRID FLORIDA's December 15, 2000 supplemental Order
No. 2000 Compliance filing has been granted. Comments will be due by January
30, 2001. RT01-67-000.

* CAL PX filed its Tariff Amendment No. 21 regarding the tracking of changes
in the method proposed by the CA ISO for allocating its Grid Management
Charge. ER01-719-000. Comments due by January 9, 2001.

* NYISO filed for a waiver for certain OASIS requirements. EL01-24-000.
Filed December 22, 2000.

* OKLAHOMA MUNICIPAL POWER AUTHORITY filed an answer to AMERICAN ELECTRIC
POWER CO.'s request to defer its application to transfer operational control
of its transmission facilities located in the SPP. EC98-40-000. Filed
December 26, 2000.

* NEPOOL Participants Committee filed an answer and ISO NE filed a
supplement to its motion to intervene regarding protests to NEPOOL's revised
Market Rules regarding support implementation of electronic dispatch (Rule
3), uplift payments at low operating limits (Rule 5), and installed capacity
responsibility (Rule 11) as well as a revised Implementation Date for
Electronic Dispatch. ER01-493-000. Filed December 27, 2000.

* KEYSPAN-RAVENSWOOD filed comments in support of NYISO's request to moot
its compliance filing. ER00-3591-000, 001 and 004 and ER00-1969-005. Filed
December 22, 2000.

* MAINE PUBLIC UTILITIES COMMISSION, the MAINE PUBLIC ADVOCATE and the
INDUSTRIAL ENERGY CONSUMERS GROUP filed a request for rehearing or an
emergency stay of the Commission's December 15, 2000 Order directing ISO NE
to implement an ICAP deficiency charge of $8.75/Kw/M retroactive to August 1,
2000. EL00-62-015. Filed December 22, 2000.

* MISO filed an answer to several protests regarding its OATT in Dockets
ER01-479-000 and ER97-1438-007. Filed December 27, 2000.

* PJM filed changes to its OATT to limit the amount of Transmission
Congestion Credits an entity that acquires a Fixed Transmission Right (FTR)
through the FTR auction may receive if it enters Increment Bids or Decrement
Bids in the Day-Ahead market that result in an increase of Transmission
Congestion Charges at or near the receipt or delivery point of the FTR.
ER01-773-000. Filed December 22, 2000.


(2) OATT/TRANSMISSION

* COMMONWEALTH EDISON filed a revised attachment K to its OATT in compliance
with the Commission's December 8, 2000 Order. ER01-99-001. Comments due by
January 10, 2001.

* AMERICAN TRANSMISSION COMPANY filed their Standards of Conduct to be
effective January 1, 2001. ER01-702-000. Comments due by January 9, 2001.

* INDIANAPOLIS POWER & LIGHT filed its first amendment to the
Interconnection, Operation and Maintenance Agreement between itself and DTE
Georgetown. ER01-718-000. Comments due by January 9, 2001.

* PJM filed an executed Interconnection Agreement between itself and
BETHLEHEM STEEL CORP. ER01-756-000. Comments due by January 12, 2001.

* ARIZONA ELECTRIC POWER COOP. filed a request for rehearing regarding the
Commission's Order determining that Standard Offer Scheduling Coordinators
should be subject to the same energy imbalance charges as Competitive Offer
Scheduling Coordinators. ER00-3583-001, ER01-173-001 and ER01-208-001.
Filed December 26, 2000.

* AMERICAN ELECTRIC POWER SERVICE filed an executed Interconnection and
Operation Agreement between INDIANA MICHIGAN POWER COMPANY and DUKE ENERGY
DESOTO. ER01-720-000. Comments due January 11, 2001.

* ILLINOIS POWER CO. filed an Interconnection Agreement between itself and
DYNEGY MIDWEST GENERATION. ER01-712-000. Comments due January 11, 2001.

* AMERICAN ELECTRIC POWER SERVICE CORP. filed an executed Interconnection
and Operation Agreement between INDIANA MICHIGAN POWER CO. and PSEG
LAWRENCEBURG ENERGY CO. ER01-721-000. Comments due by January 11, 2001.

* UTILICORP filed amendments to the OATTs for its MISSOURI PUBLIC SERVICE,
WESTPLAINS ENERGY-KANSAS, WESTPLAINS ENERGY-COLORADO and ST. JOSEPH POWER &
LIGHT operating divisions in order to avoid customers from having to pay
multiple transmission charges. ER01-723-000. Comments due by January 12,
2001.

* The AMERICAN ELECTRIC POWER SERVICE CORP. filed an Interconnection and
Operation Agreement between KENTUCKY POWER CO. and RIVERSIDE GENERATING CO.
ER01-741-000. Comments due January 12, 2001.

* The CLEVELAND ELECTRIC ILLUMINATING CO., OHIO EDISON CO., PENNSYLVANIA
POWER CO. and the TOLEDO EDISON CO. (FIRST ENERGY) filed a modified proposal
to offer ancillary services and interconnected operations services on a
non-discriminatory basis. ER00-3771-002. Filed December 21, 2000.


(3) MARKET COMPLAINTS

* DYNEGY POWER MARKETING, EL SEGUNDO POWER, LONG BEACH GENERATION and
CABRILLO I and II filed a complaint against the CA ISO requesting that the
Commission direct the ISO to cease making out-of-market (OOM) dispatch orders
on its units in non-emergency situations, require the ISO to negotiate
compensatory rates for OOM dispatch orders, file for third payment options
that generators subject to a Participating Generator Agreement could elect as
compensation for OOM dispatch orders and other relief. EL01-23-000.
Comments due January 11, 2001.

* SOUTHERN CALIFORNIA WATER CO. d/b/a BEAR VALLEY ELECTRIC SERVICE filed a
complaint against SOUTHERN CALIFORNIA EDISON (EDISON) alleging that EDISON as
seeking to unlawfully terminate the Added Facilities Agreement between the
two. EL01-25-000. Comments due January 18, 2001.

* CHEYENNE LIGHT, FUEL & POWER CO. filed a complaint against PACIFICORP
regarding a notice of termination filed on December 26, 2000 of a power sales
agreement under which PACIFICORP provides CHEYENNE full capacity and energy
requirements. EL01-21-000. Filed on December 27, 2000.


(4) MERGERS/CORPORATE RESTRUCTURING

* The MONTANA POWER CO. and NORTHWESTERN CORP. filed an application for
authorization of the disposition of certain jurisdictional assets whereby
NORTHWESTERN will purchase MONTANA's utility business. EC01-47-000.
Comments due January 11, 2001.

* The MONTANA POWER CO. filed a notice of change of status and a revised
statement of policy and standards of conduct to reflect a planned transaction
pursuant to which NORTHWESTERN CORP. will purchase the utility business of
MONTANA POWER. ER97-449-001. Comments due January 11, 2001.

* MISSISSIPPI VALLEY GAS CO. submitted a request for rehearing regarding the
Commission's November 24, 2000 Order authorizing the disposition of
jurisdictional facilities involved in the joint application filed by ENTERGY
POWER MARKETING and KOCH ENERGY TRADING. EC00-106-001. Filed December 26,
2000.


(5) MISCELLANEOUS

* MIDWEST ISO submitted an application seeking authorization to issue
long-term senior notes in an amount not to exceed $100 million.
ES01-13-000. Comments due January 12, 2001.

==OTHER NEWS==

* ATC Hits the Ground Running On Jan. 1
http://biz.yahoo.com/bw/010102/wi_america.html

* UtiliCorp Completes $190 Million Merger With St. Joseph Light & Power
http://biz.yahoo.com/bw/010102/mo_utilico_2.html

- FercFilings010102.pdf