Enron Mail

From:michael.terraso@enron.com
To:steven.kean@enron.com
Subject:
Cc:maureen.mcvicker@enron.com
Bcc:maureen.mcvicker@enron.com
Date:Fri, 8 Sep 2000 02:58:00 -0700 (PDT)

Corporate EHS Staff Meeting- The first EHS (my direct reports and their
staff) all employee staff meeting will convene at 8 am Monday September 11.
The primary objective of teh meeting is to enhance communication and
awareness within the group.

ENEL - Nicaragua - Don Stevens is currently reviewing a proposed governmental
environmental regulation regarding on-site landfills and sanitary systems
which could add increased costs to the project and will supply Orlando Puig
(Developer) with a short write up on the actions and costs associated with
the proposed regulation.

ISAGEN - Colombia - A revised scope of work to cover EH&S requirements was
provided to Harza Consultants by Don Stevens. The site visits are being
conducted by Harza Consultants this week. No Enron employees will be
traveling to Colombia due to social unrest.

Project Inga - ENA East/West - ENA is investigating a stock purchase of
Ahlstrom Development Corporation's holdings in five coal fired power
facilities. Two of the facilities (ACE Generation Company and Mt. Poso
Cogeneration Company) are located in California. Three of the facilities
(Panther Creek Partners, Inter-Power Ahlcon LP (Colver) and Gilberton Power
Company) are located in Pennsylvania. ENA has contracted RTP Environmental
Associates to conduct the due diligence (fatal flaw) and site visits. The
site visits will be conducted 9/5/00 - 9/8/00 for the California facilities
and 9/12/00 - 9/15/00 for the Pennsylvania facilities. Don Stevens will be
conducting the environmental review of RTP's report. The commercial
objective is to restructure the PPA.

EH&S Compliance Requirements Summary - Susan Worthen is developing the
Summary with the intent to provide Enron commercial groups with a brief
understanding of EH&S requirements necessary in operating a facility. The
Summary will be routed to other EH&S individuals within Enron for their input
before distribution or use in meetings.

Eletrobolt PP (Brazil) - Joe Kolb participated in a conference call regarding
this project ; another power plant situated immediately adjacent to RioGen
PP, with some compression on the natural gas pipeline lateral being
constructed for RioGen. RioGen and Eletrobolt have different ownership
mixes. Environmental impact assessment and air emission modeling are
critical path issues.

CEP Survey - Susan Worthen and Lauren Golblatt provided information to Gwynn
Hanmer Gorush (community affairs) for a survey by the Council on Economic
Priorities.

Enron Methanol Plant Economic Study - Marc Phillips submitted information to
the Business Coalition for Clean Air (BCCA) regarding the economic impact of
the proposed NOx RACT rules on the methanol plant reformer and engines. The
total cost to install controls and electrify the engines at the methanol
plant is estimated at $18.2 million.

Participation on ANSI Standard Setting Committee - Russell Tucker has been
accepted as an Observer member on the Accredited Standards Committee for the
Z10 Occupational Health and Safety Systems proposed ANSI standard. The
completion of this ANSI standard will have an impact on all Enron companies
in the US and territories, followed thereafter with impact to Enron
international interest involved in ISO certifications. Russell Tucker will
also serve on the API Z10 task force.

Ergonomics Software Program - Russ Tucker is coordinating an Enron pilot
computer based training program on ergonomics. the purpose is to grandfather
Enron prior to passage of prescriptive OSHA regulations requiring such a
training program for any employee who uses a computer for 50% of their work
effort. However, everyone must not necessarily have used the software
training program before the regulations pass. There are costs saving in
becoming grandfathered, because of the flexibility of using the computer
based training program in lieu of the prescriptive OSHA programs.

Caledonia Power Plant - The Mississippi Environmental Enforcement Division
conducted an unannounced environmental inspection at the EES OEC power
plant. No significant issues were identified in the inspection.

EES Origination - Mike Terraso facilitated an introduction of EES Harold
Buchanan and Michael Mann to General Motors Vice President of Environmental
and Energy to initiate a energy outsourcing proposal.

Pipeline Safety Legislation- Jeff Keeler continues to lead the Enron effort
in monitoring and influencing the Senate and House versions of potential
pipeline safety legislation. He is working closely with Stan Horton and
David Johnson in GPG. The Senate version passed late on Thursday September
7th.