Enron Mail |
Following please find a summary of the minor Y2K related glitches that=20
various business units experienced following the rollover. As you can see,= =20 the problems we encountered were minimal indeed. Testing of less critical= =20 functions is ongoing and will continue through normal operations. Enron Europe ETOL - Power Station Optimizer application is not accepting data. The=20 application is used for informational purposes only, and has no control=20 functionality. Operations are not affected. ETOL will have the applicatio= n=20 repaired early next week. London - Enpower Europe deal selection criteria is not working with date=20 criteria. The application does function with deal numbers, however. The= =20 Houston application team is currently working on the problem.=20 London - Global Products Accounting has a minor data import problem. The= =20 problem does not impair daily operations. Repair date is set for January 4= . Enron House - Fire detection system alarm lights do not turn off following= =20 tests. The problem is cosmetic only. Also, remote alarm systems skipped= =20 forward to the date January 31, 2000. It is believed the problem is also= =20 cosmetic only. EOTT Ticketing entry system had a minor problem which has already been repaired. General ledger application has a program that displays the year 1900. The= =20 extent of the issue and whether the problem is cosmetic only, is being=20 pursued. International Regions Transredes, Columbia - The pipeline SCADA (Supervisory, Control, and Data= =20 Acquisition) system failed shortly after midnight. This means the pipeline= =20 control center is not automatically receiving pipeline information. The=20 system is used for information purposes only and has not affected operation= s. Enron North America=20 ENA - Enpower deal selection criteria is not working with date criteria. Sa= me=20 as item two of Enron Europe. ENA has already repaired the problem for North= =20 American operations. Currently discussing European implementation timeline. ENA - SIFT application has a Microsoft Import problem. This process is not= =20 critical to daily processes conducted by Global Products. Same issue as Enr= on=20 Europe item three. Repair date is January 4. FacSys 4.1 passing wrong date, 01/01/100 instead of today=01,s date of=20 01/01/2000, to the fax machine which prints on the banner information.=20 Remediation scheduled before January 4. Remediated three Excel macros in the non-commodity trading function.
|