Rob

Can you make sure that the Toronto Office is not blowing their minds on
costs.


---------------------- Forwarded by John J Lavorato/Corp/Enron on 09/20/2000
07:37 AM ---------------------------



From: Kevin M Presto @ ECT 09/18/2000 05:29 PM


To: John J Lavorato/Corp/Enron@Enron, Mark Dana Davis/HOU/ECT@ECT
cc: Lloyd Will/HOU/ECT@ECT, Mitch Robinson/Corp/Enron@Enron

Subject: PI Installation Report


I totally support having a separate marketing and trading team in Ontario to
focus on the opening of that market. However, with respect to creating a
redundant physical system operation/real-time unit monitoring/dispatch
function in Ontario, it simply does not make economic or logistical sense.
With the integration of the 6 peaker plants into our operation and the
associated IT support, control area operations, plant operations, hourly
trading, and real-time monitoring system here in Houston, we could provide
all the necessary tools and support personnel necessary to perform this
function from Houston. All the critical trading information would obviously
be available to the Ontario office, yet they would not have to be burdened by
the additional overhead to build a stand alone physical operation.

From my standpoint, it just doesn't make sense to re-create the physical
capabilities the Houston office has developed over the past two years. The
Ontario guys are doing a great job and I like their aggressive attitude,
however, rationale business decisions should still prevail.

Your thoughts?
---------------------- Forwarded by Kevin M Presto/HOU/ECT on 09/18/2000
05:01 PM ---------------------------


Lloyd Will
09/18/2000 03:41 PM
To: Garrett Tripp/TOR/ECT@ECT, Paul Devries/TOR/ECT@ECT, Jan
Wilson/TOR/ECT@ECT, Jeff Borg/TOR/ECT@ECT
cc: Mitch Robinson/Corp/Enron@Enron, Kevin M Presto/HOU/ECT@ECT, Dana
Davis/HOU/ECT@ECT, Edward D Baughman/HOU/ECT@ECT
Subject: PI Installation Report


Attached is the data you requested today. The schematic detail requested
can be found in the email attachment at the bottom of this email. Please
also contact Ed Baughman on the TIE proposal for dispatching, scheduling and
trading services that was recently done to leverage of the existing Genco
facilities and staff.

On the dedicated ring downs all work was co-ordinated by Darren Adamik
(713-853-4764) if you require additional details.

Generally it will take 4 staff for a 24 hour operation plus one vacation/sick
relief. Depending on the complexity of the operation you will have to
determine the level of industry expertise. A good plan would be to hire a
senior lead utility type and then bring on junior staff. The quality and
quantity of staff will likely be based on the value at risk and the
complexity of dispatching these units.

If you consider the operation critical a diesel and UPS will be required.

Plasma displays run $10,000 to $15,000 per display plus any switching/av
equipment.

We have a PI consultant on contract that could be available for your PI
project - typically $ 150.00 per hour plus travel and expenses.

The above assumes that no special hardware/software is required from The IMO
to dispatch these units.

______________________________________________________________________________
_______________
I have also attached the initial PI project spreadsheet for your review and
the following email for our PI order.

Please issue Two Purchase Orders to:
OSI Software, Inc
Attention: Richard Crounse
Fax Number 281-920-6199

Enron Software Licensing Contact: Gene Diers, x36361
Charge to Company Number 34K (East Power Generation - GENCO), RC 2176, Work
Order S30084

These purchase orders need to be issued by December 14. Time is of the
essence. The attached quotation from OSI Software is for reference.

One purchase order should be titled: Remote Monitoring - OSI PI Software
System
The amount is: $ 304,571.25

Item Description
PI-BP Server Base Package $ 75,000
PI-IN-STANDARD-NT OSI Standard Interfaces $ 60,000
Custom Interfaces Custom Interfaces $ 35,000
PI-IN-ES-HABSC Esca HABITAT-SCADA $ 5,000
PI-Manage Process, Datalink, ODBC, Batch $ 21,725
PI-ActiveViewer Web Enabled View $ 15,000
PI-API Application Programming Interface $ 1,250
PI System Manuals PI System Manuals $ 1,000
PI Client Manuals PI Client Manuals $ 2,000
PI-ActiveViewer Manuals PI ActiveViewer Manual $ 0

PI TSA Pricing Technical Support Annual Fee $ 88,596.25


The second purchase order should be titled: Remote Monitoring - OSI PI
Software Services
The amount (Not to Exceed) is: $ 157,750
This purchase order is to be a Not-To-Exceed to cover variable costs as they
get charged for installations services, travel and living expenses, and
training. The final invoiced amount is likely to be different from that
ordered.

Item Description
On-site Custom On-site Custom Services $ 50,000
Installation Installation Services $ 67,500
Training Training Services $ 35,400






---------------------- Forwarded by Lloyd Will/HOU/ECT on 09/18/2000 02:30 PM
---------------------------


Ramesh Swaminathan@ENRON
09/18/2000 01:49 PM
To: Lloyd Will/HOU/ECT@ECT
cc:
Subject: PI Installation Report



FYI
---------------------- Forwarded by Ramesh Swaminathan/Corp/Enron on
09/18/2000 01:48 PM ---------------------------

Enron North America Corp.

From: Richard Broussard 08/22/2000 03:24 PM


To: Art Stappenbeck/ECP/Enron@Enron
cc: Bill Viola/ECP/HOU/ECT@ECT, Brian Peteler/ECP/Enron@Enron, John
Snell/ECP/Enron@Enron, John Brady/ECP/HOU/ECT@ECT, Tom
Milillo/ECP/HOU/ECT@ECT, Mitch Robinson/Corp/Enron@Enron, Madhup
Kumar/Corp/Enron@ENRON, Alan Chen/Corp/Enron@Enron, Ramesh
Swaminathan/Corp/Enron@ENRON

Subject: PI Installation Report


Art,

Please find attached my report on the PI installation at the ECP plants. If
all goes as expected, we should be wrapped up by September 1. The total cost
to date is approximately $75K with an additional $33K expected. Please call
if you have any questions.

Regards,
Rick Broussard
(713) 853-5316