![]() |
Enron Mail |
Mark:
I have talked with Jennifer Greenwell about the Nadel & Gussman, Buffalo Hunt # 21 well to be drilled starting on or around October 15, 2001. The target is the Atoka Morrow formation with expected volumes of about .5 to 1.0 mmbtu/d with a working pressure of 600 psig. The well location is about a mile off of our 24" WTX Lateral at Mile Post 28.5 south of Station # 9. N&G will have to set a small compressor to get into TW, because the line pressures are in the range of 750 - 950 psig. The alignment sheets do not indicate an existing tap on either of our lines, a new hot tap will be required for connection. The volumes are so small that it appears it might be more cost effective to lay the 5 mile of line pipe to Agave. The following are the results of a discussion I had with the Earl (E&C) on the costs required to connect to our system. Hot Tap and EFM $75,000 H2S & H2O $24,000 Unknowns $30,000 Totals $129,000 Basically, the range is around the $100K to $130K level. I will need to verify with the Carlsbad Team about the project if it looks like a go. Jennifer was going to use the numbers to figure her cost/benefit analysis for choosing TW or Agave. My recommendation would be to go to Agave, if she can justify the costs for 5 miles of line. Perry Frazier 713-853-0667 -----Original Message----- From: Alters, Dennis Sent: Thursday, October 04, 2001 10:34 AM To: Frazier, Perry; McConnell, Mark Cc: Abdmoulaie, Mansoor Subject: TW Well Connects Mark, Perry will be your direct contact on these projects. Perry, Please provide location and avaliable tap information to Mark. I have left a message for Mark to see if he will need Planning to provide Level A Cost estimates. It is OK to contact the producers directly. Well # 1 - Cima - Contact Tommy Edwards 713 209 1112 500-1000 MMBtu/d Approx. 600 psig T19S R21E Section 31- Eddy or Chaves County, Tx 15 Miles S/SW of Hope Well # 2 - Nadel and Gussman - Contact Jennifer Greenwell 918 583 3333 500 - MMBtu/d Approx. 200 to 300 psig T13S R27E Section 21
|