Enron Mail

From:l..nicolay@enron.com
To:m..presto@enron.com, douglas.smith@enron.com
Subject:FW: SPP Retail Market Opening Testimony
Cc:
Bcc:
Date:Mon, 15 Oct 2001 13:28:40 -0700 (PDT)

AEP asked the Texas PUC to postpone opening the Texas (outside of ERCOT) re=
tail market because there is no centralized dispatch (per Ron M's testimony=
on behalf on AEP). After talking with our SPP folks (I understand that EP=
MI has bid to serve a portion of Entergy's load) , Jim's testimony is that =
the outside of ERCOT Texas market should open 1/1/02 and that other states =
have implemented retail open access without a centralized dispatch model (f=
or example, AEP in Ohio, ComEd in Ilinois and Duquense in ECAR/PA). Jim st=
ates that while RTOs and central dispatch will certainly facilitate the mar=
ket, it is not absolutely required, and that, if AEP thinks that the retail=
market will not be competitive without it, then, perhaps, REPS other than =
AEP should be the only ones allowed to serve retail load in this part of Te=
xas until central dispatch is in place. In addition, he states that the im=
balance provisions should be changed and that network firm capacity should =
be available to REPs (without the need for protracted system impact studies=
, since the load is already being served.)

Apparently, Entergy has also changed its mind and now is opposing the 1/1/0=
2 opening of the Entergy/Texas retail market.

-----Original Message-----
From: =09Steffes, James D. =20
Sent:=09Friday, October 12, 2001 1:37 PM
To:=09Herndon, Rogers; Rorschach, Reagan; Acevedo, Rudy; Kroll, Heather; Ni=
colay, Christi L.; Maurer, Luiz; Keene, Patrick; Twiggs, Thane; Ryall, Jean=
; Hamb, Edward
Subject:=09SPP Retail Market Opening Testimony

Attached is the testimony that I filed today asking thh PUC of Texas to ope=
n the retail markets in the SPP territory.

Thanks,

Jim