Here is the VOM and Heat Rate for the Little Rock, Ark. site located in
Entergy (Entergy Hub). The site is on Entergy's 500 kV line and on NGPL's pipelines. VOM and H.R's are the following: VOM = $1.00 w/o major maintenance There are four levels of running the configuration: Full Output with Duck Firing: 542 MW's/ 8,842 Heat Rate Full Output wothout Duck Firing: 422 MW's/7,907 Heat Rate One GE 7EA: 105 MW's/8,251 Heat Rate Warm running GE 7EA: 59 MW's/ 9,831 Heat Rate Let me know if you have any questions. Thanks! Ben 3-7998
|