Enron Mail

From:chris.walker@enron.com
To:kevin.ruscitti@enron.com
Subject:FW: Sigma Factor Request (US Gas Phy Fwd Secondary Firm)
Cc:
Bcc:
Date:Mon, 9 Apr 2001 07:38:00 -0700 (PDT)

Kevin,

Jeff and Susan are in our tax group and have a question stated below
regarding the interconnects to ML7.

Chris
---------------------- Forwarded by Chris Walker/HOU/ECT on 04/09/2001 02:36
PM ---------------------------
From: Jeff Blumenthal/ENRON@enronXgate on 04/09/2001 02:07 PM
To: Chris Walker/HOU/ECT@ECT
cc: Susan Musch/ENRON@enronXgate
Subject: FW: Sigma Factor Request (US Gas Phy Fwd Secondary Firm)

Chris,

Can you let Susan and me know exactly where the ML7 interconnects are located?

-----Original Message-----
From: Walker, Chris
Sent: Monday, April 09, 2001 1:22 PM
To: Adams, Matthew; Hayden, Frank
Cc: Lees, Lisa; Sever, Stephanie; Sweitzer, Tara; Kenne, Dawn; Moorer,
Torrey; Gockerman, Matthew F.; Blumenthal, Jeff; Musch, Susan; Lozano, Melba;
Meredith, Kevin; Cass, Robert
Subject: Sigma Factor Request (US Gas Phy Fwd Secondary Firm)

Matt or Frank,

Please provide a sigma factor for the following product type requested by
Kevin Ruscitti:

US Gas Phy Fwd Secondary Firm

A US gas transaction with Enron North America Corp., under which Seller shall
sell and Buyer shall purchase a quantity of natural gas equal to the Daily
Contract Quantity at the Contract Price on a Secondary Firm basis. The
Contract Price shall be as submitted by Counterparty via the Website. The
Period of Delivery shall be from the Effective Date through the Termination
Date.
The term of the Transaction shall be from the Effective Date to the
Termination Date. The Effective Date is 01 May 2001. The Termination Date is
31 May 2001.
The Transaction is for delivery at an ANR Pipeline Company ML7 interconnect.
The Purchaser will determine at what ML7 interconnect to take delivery. The
volumes Delivered by the Seller are subject to reductions due to operational
constraints on the ANR Pipeline system. In the event that scheduled volumes
are reduced due to pipeline operational constraints, Buyer will designate an
alternate ML7 delivery location until an unconstrained point is designated.
In the event that the Buyer cannot take receipt at an alternative ML7 point,
the Buyer must arrange for the gas to be delivered off-system, stored or
parked at the Buyer's expense. These reductions due to Pipeline System
constraints are not considered a failure to perform by the Purchaser.
The price is quoted in US Dollars per unit of volume, which will be the
Contractual Currency.
The unit of measure against which the price is quoted shall be millions of
British thermal units and the quantity shown shall be in millions of BTUs per
day.




Thanks,

CW
3-7533