Enron Mail |
Cara / Corry,
I have released into stage new versions of PreSchedule and Path Confirmation. Included in the new release are... Pre-Schedule Workspace: Fix to "Variant Conversion" errors. Now able to print Error Log. Border2 is not required for creating confirmation records nor for creating route data. Include Transmission information in the path when creating confirmation records. The path should resemble: UPSTREAM-SUPPLY-E-TRAN1(OASIS ID)-E-TRAN2(OASIS ID)-E- ... -MARKET-DOWNSTREAM Make Build Route sheet read only to prevent removal of data. Build Routes is dependent on the data staying in the sheet to determine if deals have changed. Add an option to clear the sheet to start over. The transmission deal number is not required for path confirmation records. "Copy Workspace" functionality. Allow change font properties (color, bold, etc) and cell properties (highlight color). Allow searching in the sheets. e.g. search for a deal number. A simple search for string or number will do. Neither Upstream nor Downstream are required for path creation. Fix "General SQL error. ORA-02289: sequence does not exist" problem. 'Get Now' when repeatedly pressed does not cause application to be unstable Path Confirmation: ? Added preferences for storing and setting the display colors in the grid ? "Invalid BLOB handle in record buffer " error is fixed ? Enpower counterparty long names are shown ? Improved loading time while opening path confirmation dialog ? Provided an option confirm the paths in batches, ? Path cut check box indicator is fixed Regards, Will
|