![]() |
Enron Mail |
Comments on the draft generator interconnection products and studies are due to FERC by NOON on Friday, November 23rd. They are asking that comments be posted to the intranet site. A copy of the draft is attached.
- gen_ic_products_services- Lucas changes.DOC
|