Kim
I called Earl Chanley regarding the "B" release and he mentioned that go ahead and use this as a "B" release because it is close enough. If you have any questions please call. Mansoor -----Original Message----- From: Chanley, Earl Sent: Monday, September 10, 2001 7:20 AM To: Abdmoulaie, Mansoor Subject: Atoka Cost Mansoor The level "A" cost for the Agave I/C on the TW West Texas Lateral are as follows. Tap on WT lateral $75,000 The I/C is a 10" UltraSonic designed for a range of 35 mmcfd to +100 mmcfd. By using the US meter, this allows a wide range of volumes without changing out the tube when Agave want to increase the volumes. I/C to include US meter H2S H2O Chromatograph Flow control Positive Shut in EFM DAS UPS Building GFC Material cost = $210,000 Install cost (contractor, inspection, Dlab, Eng, Proj. man) = $130,000 Contingency = $ 50,000 OH, AFUDC, = $ 19,000 Total of I/C = $399,000 Total of tap = $75,000 Total installed cost = $474,000 This is a Level "A" cost and to target the equipment needed and bring the cost into a Level "B" will required a defined scope with Agave. THE TIME REQUIRED FOR A PROJECT TO BE IN SERVICE IS 90 DAYS FROM THE APPROVED WORK ORDER. Earl Chanley
|