Enron Mail |
------------------------------------------------------------------------------
------------------------ W E E K E N D S Y S T E M S A V A I L A B I L I T Y F O R December 15, 2000 5:00pm through December 18, 2000 12:00am ------------------------------------------------------------------------------ ------------------------ SCHEDULED SYSTEM OUTAGES: ARDMORE DATA CENTER - FACILITY OPERATIONS: Impact: EOTT Time: Sat 12/16/2000 at 8:00:00 AM CT thru Sat 12/16/2000 at 9:00:00 AM CT Sat 12/16/2000 at 6:00:00 AM PT thru Sat 12/16/2000 at 7:00:00 AM PT Sat 12/16/2000 at 2:00:00 PM London thru Sat 12/16/2000 at 3:00:00 PM London Outage: Rework of Ardmore Ethernet Switches Environments Impacted: EOTT Purpose: Simplify the network and remove unnecassary equipment Backout: Remove the cables from the devices that do not respond to ping and reattach the cables that connect to the Cat5000.. Contact(s): Vincent Fox 713-345-7784 ron pieronek 713 853 6683 AZURIX: No Scheduled Outages. EB34 DATA CENTER - FACILITY OPERATIONS: Impact: all Time: Fri 12/15/2000 at 7:00:00 PM CT thru Sun 12/17/2000 at 7:00:00 PM CT Fri 12/15/2000 at 5:00:00 PM PT thru Sun 12/17/2000 at 5:00:00 PM PT Sat 12/16/2000 at 1:00:00 AM London thru Mon 12/18/2000 at 1:00:00 AM London Outage: Relocate Bell St. generator Environments Impacted: All Purpose: Required now to complete new building. Status telephone number is 713.345.3215 starting on Friday at 7:00pm Backout: Work will be cancelled if extreme weather is forcast. Contact(s): Randy Lord 713-345-7707 EDI SERVER: Impact: CORP Time: Sat 12/16/2000 at 11:00:00 PM CT thru Sun 12/17/2000 at 3:00:00 AM CT Sat 12/16/2000 at 9:00:00 PM PT thru Sun 12/17/2000 at 1:00:00 AM PT Sun 12/17/2000 at 5:00:00 AM London thru Sun 12/17/2000 at 9:00:00 AM London Outage: EDI Hub Memory Upgrade Environments Impacted: Corp Purpose: System reaching 80% utilization on peak volume days. Increased memory will reduce page swapping which will reduce CPU utilization. Backout: Remove memory and restart system. Contact(s): Karen O'Grady 5-7149 713-327-4805 jim nelsom 3-7799 713-327-2007 Jack Metkus 3-0362 713-288-0743 EI: Impact: EI Time: Sat 12/16/2000 at 9:00:00 AM CT thru Sat 12/16/2000 at 10:00:00 AM CT Sat 12/16/2000 at 7:00:00 AM PT thru Sat 12/16/2000 at 8:00:00 AM PT Sat 12/16/2000 at 3:00:00 PM London thru Sat 12/16/2000 at 4:00:00 PM London Outage: 3AC 6500 Conversion Phase 4 (Final) Environments Impacted: El Purpose: Replace Failing 5500's Backout: reconnect 5500's Contact(s): Steve Hardy 713-853-9294 713-415-0672 Impact: EI Time: Fri 12/15/2000 at 6:30:00 PM India thru Sat 12/16/2000 at 12:30:00 PM India Fri 12/15/2000 at 7:00:00 AM CT thru Sat 12/16/2000 at 1:00:00 AM CT Fri 12/15/2000 at 5:00:00 AM PT thru Fri 12/15/2000 at 11:00:00 PM PT Fri 12/15/2000 at 1:00:00 PM London thru Sat 12/16/2000 at 7:00:00 AM London Outage: Relocation of Network Equipment. INDIA Environments Impacted: Enron India Purpose: Lease expiration from the 15th floor Backout: Contact(s): Omar Taha 7138531958 877-820-5523 ENRON NORTH AMERICAN LANS: No Scheduled Outages. FIELD SERVICES: No Scheduled Outages. INTERNET: Impact: Eol Time: Fri 12/15/2000 at 6:00:00 PM CT thru Fri 12/15/2000 at 8:00:00 PM CT Fri 12/15/2000 at 4:00:00 PM PT thru Fri 12/15/2000 at 6:00:00 PM PT Sat 12/16/2000 at 12:00:00 AM London thru Sat 12/16/2000 at 2:00:00 AM London Outage: adding two firewalls to eol Environments Impacted: EOl Purpose: 1. off load the existing firewalls. 2. add stateful failover for internet eol users. Backout: remove new firewalls Contact(s): Anchi Zhang 713-853-5464 MESSAGING: No Scheduled Outages. MARKET DATA: No Scheduled Outages. NT: No Scheduled Outages. OS/2: No Scheduled Outages. OTHER SYSTEMS: Impact: ESA Time: Sun 12/17/2000 at 8:00:00 AM Brazil thru Sun 12/17/2000 at 6:00:00 PM Brazil Sun 12/17/2000 at 4:00:00 AM CT thru Sun 12/17/2000 at 2:00:00 PM CT Sun 12/17/2000 at 2:00:00 AM PT thru Sun 12/17/2000 at 12:00:00 PM PT Sun 12/17/2000 at 10:00:00 AM London thru Sun 12/17/2000 at 8:00:00 PM London Outage: Maintenance to the electrical systems Environments Impacted: Sao Paulo Office Purpose: Security maintenance Backout: Back to the original project. Contact(s): Nilson Busto 7910-1347 Impact: SAP Time: Fri 12/15/2000 at 6:00:00 PM CT thru Sun 12/17/2000 at 3:00:00 PM CT Fri 12/15/2000 at 4:00:00 PM PT thru Sun 12/17/2000 at 1:00:00 PM PT Sat 12/16/2000 at 12:00:00 AM London thru Sun 12/17/2000 at 9:00:00 PM London Outage: SAP Production Builds Environments Impacted: SAP Purpose: Integration of new companies and business functionality into the current configuration Backout: Stop the build and/or restore the systems Contact(s): Michael Vu 713-853-5312 Todd Renaud 713-853-0516 800-696-9896 Gary Sentiff 713-853-6410 888-916-7906 Impact: CORP UNIX Time: Sat 12/16/2000 at 6:00:00 AM CT thru Sun 12/17/2000 at 6:00:00 AM CT Sat 12/16/2000 at 4:00:00 AM PT thru Sun 12/17/2000 at 4:00:00 AM PT Sat 12/16/2000 at 12:00:00 PM London thru Sun 12/17/2000 at 12:00:00 PM London Outage: Gutenberg disk array reformat. Environments Impacted: Corp Purpose: Conform the disk layout to standard. to improve performance. Enable refresh from other databases by matching the layout. Backout: Restore from tape. Contact(s): Malcolm Wells 713-345-3716 Sanjay Bhagat 713-345-8082 David Wile 713-345-3867 SITARA: No Scheduled Outages. SUN/OSS SYSTEM: No Scheduled Outages. TELEPHONY: No Scheduled Outages TERMINAL SERVER: No Scheduled Outages. UNIFY: Impact: CORP Time: Fri 12/15/2000 at 6:00:00 PM CT thru Fri 12/15/2000 at 8:00:00 PM CT Fri 12/15/2000 at 4:00:00 PM PT thru Fri 12/15/2000 at 6:00:00 PM PT Sat 12/16/2000 at 12:00:00 AM London thru Sat 12/16/2000 at 2:00:00 AM London Outage: Eclipse Relocation Environments Impacted: All Purpose: Server upgrades have come in that need to be installed Backout: Contact(s): Jason Stephens 713-853-1834 ------------------------------------------------------------------------------ ------------------------------------------------------- FOR ASSISTANCE (713) 853-1411 Enron Resolution Center (713) 853-5536 Information Risk Management Specific Applications Help: Unify On-Call (713) 284-3757 [Pager] Sitara On-Call (713) 288-0101 [Pager] RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager] OSS/UA4/TARP (713) 285-3165 [Pager] CPR (713) 284-4175 [Pager] EDI Support (713) 327-3893 [Pager]
|