Jim and Darren,
We relieved Path 15 congestion for HE 7 on Saturday morning. We flowed 10 mws from Malin to FC345. This resulted in the 10 mw "variance" in the report. I have added deals to Enpower to flatten the report, these deals are only necessary for the sake of the report. The identical variance in the north and south indicates a wheel or load shift. I prefer to not enter these extra deals. Please see me with questions if you do not understand why the report variance exists. Thanks, Bill
|