Enron Mail

From:bob.hillier@enron.com
To:andy.zipper@enron.com
Subject:FW: Tradespark Requirements
Cc:
Bcc:
Date:Thu, 7 Dec 2000 14:55:00 -0800 (PST)

Andy, do we have any intention of doing any integration with Tradespark at
this time? If we do I will get more involved in this otherwise we will just
let the infrastructure team continue to run with this.

Let me know,
bbh

-----Original Message-----
From: Bob McAuliffe
Sent: Tuesday, December 05, 2000 1:50 PM
To: Bob Hillier
Subject: FW: Tradespark Requirements

I need to have another discussion about this with you . . . we need an
application group to work on this, because there is quite a bit of
application analysis that needs to be done.

I found out that from an infrastructure perspective, this is much more than
just a remote connection. It involves an application implemented in our
environment, and applications deployed to the desktop. Is this something the
e-commerce team needs to be involved in (I don't think it is), but probably
more like Beth Perlman's team.

Bob.

-----Original Message-----
From: "Matricciano, Marcello" <MMatricciano@espeed.com<@ENRON
[mailto:IMCEANOTES-+22Matricciano+2C+20Marcello+22+20+3CMMatricciano+40espeed+
2Ecom+3E+40ENRON@ENRON.com]
Sent: Wednesday, November 29, 2000 11:12 AM
To: McAuliffe, Bob
Subject: FW: Tradespark Requirements

Correction to previous e-mail:
The equipment we would send to Enron would comprise of 2 Cisco 2600
Routers (1 for each circuit), 2 Cisco Hubs, 2 Sun Ultra 5s with 2 NIC cards
each. Each Sun would connect to its own hub and router for redundancy and
load balancing purposes.
Sorry for the confusion.

Marcello

< -----Original Message-----
< From: Matricciano, Marcello
< Sent: Wednesday, November 29, 2000 11:49 AM
< To: 'Bob McAuliffe'
< Subject: Tradespark Requirements
<
< Bob,
< At this present time TradeSpark intends on order 2 diverse 128K
< dedicated digital Fractional T-1 circuits (1 from Westcomm, 1 from Cable &
< Wireless). These circuits would terminate at a specific location within
< your Comms Room. From there we would request to have the circuits extended
< as to where our equipment would live. The standard equipment used in a
< TradeSpark installation are as follows: 1) one Cisco 2600 Router, 2) one
< Cisco 16 port Manageable Hub, 3) one Sun Ultra 5 with 2 interfaces: one
< for us, one for your network. The Sun Ultra 5 does not come with a monitor
< so the space requirements for this installation are minimal. The 2
< circuits would connect directly into the WIC cards on the router. No
< modems are required.
< Once the equipment is installed and tested we can begin the process
< of connecting from your network. All we need from Enron is a network IP
< address to configure onto the 2nd interface on the Sun box. All
< interfacing is done via this interface. If there is a firewall between our
< box and your network, our application requires TCP/IP bi-directional
< ports 8000 and 9000 to be opened. Please feel free to call me @ (212)
< 938-4726 if you have any further questions and/or issues.
<
<
< Marcello Matricciano