Enron Mail |
Here is the hedge summary for July 3/01.
Two things to note are: 1) I bought 125 MW of Cal 02 flat from Mirant for a 10 GJ/MWh heat rate 2) There is now a 20 year AECO basis curve, so the fixed price AECO gas from cal 15 on is generated off this curve. Before the AECO basis curve stopped at Cal 14
|