Enron is willing to perform the operation under question (1) but not (2) and (3) as we have no control over these processes and only have control over process (1).
The System Controller can contact Enron Canada Power Corp at the number in your files.
-----Original Message-----
From: Richey, Cooper
Sent: Friday, December 07, 2001 8:30 AM
To: Zufferli, John
Subject: FW: Supply Shortfall Procedures

in case you didn't get this

-----Original Message-----
From: Ken.Gardner@powerpool.ab.ca@ENRON
Sent: Wednesday, December 05, 2001 3:30 PM
To: pat_cooper@transalta.com; mwindsor@enmax.com; mike.cooper@atcoelectric.com; kjdberg@epcor.ca; alr@city.red-deer.ab.ca; nigpim@city.medicine-hat.ab.ca; olenz@city.lethbridge.ab.ca; david.carmichael@atcopower.com; john.ell@atcopower.com; gord.mcphee@atcopower.com; alhoffort@epcor.ca; adele_birchill@transalta.com; bhan@epcor.ca; martin.merrit@engageenergy.com; wayne_occonnor@transcanada.com; Richey, Cooper; joeg@encoreenergy.com; wickhamc@novachem.com; pgschubert@dow.com; dmitchell@suncor.com; anderson.murray@syncrude.com; Marie_Gallant@PanCanadianEnergy.com; doug.heath@balancingpool.ca; lloyd_bures@transalta.com; dave_currie@transalta.com; royhanson@epcor.ca; chrisc@cnrl.com; denis.martin@airliquide.com; c.morgan@epcor.ca; brian_novak@transalta.com; joe.goebel@ualberta.ca
Cc: Doug.Hincks@powerpool.ab.ca; jim_paton@transalta.com
Subject: Supply Shortfall Procedures

As I have discussed with many of you, we are revising the Power Pool Supply
Shortfall Procedures (POP 801) in accordance with Transmission Operating
Policy OP-107. POP 801 contains several steps from the time all the energy
in the energy market merit order has been dispatched up, to the time when a
firm load directive will be issued by the System Controller to curtail firm
load. In order to gather the information required to develop the procedure,
would you please answer the following questions. Any action you choose to
take is on a voluntary and best effort basis, without any obligation on your
behalf.

In an effort to reduce the amount of, or possibility of having to issue, a
firm load directive to curtail load, would you please reply whether you will
comply with any of the following requests from the System Controller prior
to the issuing of a firm load directive to curtail load. Please reply not
applicable (N/A) to the questions that do not apply to you. If you will
comply to any of these requests, we will include the request(s) in the steps
identified in POP 801. Also, if you will comply to any of these requests,
please indicate the appropriate party for the System Controller to contact.
If you choose not to comply with any of these requests please reply that you
will not. This will let us know not to make a request for something that
will not be provided, which otherwise could cause confusion and waste
valuable time during the management of this type of an event.

1. Would you provide available generation energy that was not offered into
the energy market merit order if requested to do so by the System Controller
prior to a firm load directive to curtail load?

Name of Plant: Response (Y/N):
If yes, please indicate who the System Controller is to contact:

Name of Plant: Response (Y/N):
If yes, please indicate who the System Controller is to contact:

Name of Plant: Response (Y/N):
If yes, please indicate who the System Controller is to contact:

2. Would you reduce non-essential station service loads at your plant(s) if
requested to do so by the System Controller prior to a firm load directive
to curtail load?

Name of Plant: Response (Y/N):
If yes, please indicate who the System Controller is to contact:

Name of Plant: Response (Y/N):
If yes, please indicate who the System Controller is to contact:

Name of Plant: Response (Y/N):
If yes, please indicate who the System Controller is to contact:

3. Would you reduce non-essential drag line loads (if applicable) if
requested to do so by the System Controller prior to a firm load directive
to curtail load?

Location: Response (Y/N):
If yes, please indicate who the System Controller is to contact:

Location: Response (Y/N):
If yes, please indicate who the System Controller is to contact:

4. Would you provide a 3% (or another value) reduction in distribution
voltage if requested to do so by the System Controller prior to a firm load
directive to curtail load?

Name of Wire Service Provider:

If yes, please indicate who the System Controller is to contact:


Please email or fax your response to me by December 12. If you have any
questions please contact me. Your reply (either way) is appreciated.

Thank you,
Ken Gardner
Pool Code Analyst
Power Pool of Alberta
Phone: (403) 233-6416
Fax: (403) 543-0388